Find out how we followed and realized some of the most relevant works.
Different works, same ambition to excellence as always.
Si tratta di un intervento di ristrutturazione edilizia dell’edificio B303 sito in Sigonella NAS I [...]
WeDB supported the construction management for the articulated ESPC site at Sigonella through the [...]
These are 3 different contracts for which WeDB has drawn up a series of projects [...]
Multiple facility repairs" is a project involving various repair work divided into CLINs. CLIN I [...]
The objective of this project is to repair the HVAC system of four buildings: B225, [...]
The WeDB Team completed the executive projects in synergy with Gemmo S.p.A. as part of [...]
WEDB has always worked in the field of lighting system design engaged in several [...]
B510 is a Global Hawk Hangar located at NAS II Sigonella, Sicily, Italy, positioned within [...]
Construction of a new Aerospace Ground Equipment (AGE) facility for the U.S. Air Force 7th [...]
Our design team supports customers in the development of the Facility Electronic Operation And [...]